PROJECT EXPERIENCE

FCI Ashland

Building Systems & Energy Infrastructure Improvements
Ashland, Kentucky

PROJECT OVERVIEW

Energy-Efficiency Improvements Across a Federal Correctional Campus

CIMCO performed a broad package of mechanical and energy-infrastructure improvements at the Federal Correctional Institution in Ashland, Kentucky, working as a mechanical subcontractor to Siemens Government Technologies under a Federal Bureau of Prisons Energy Savings Performance Contract.

The work addressed multiple building systems across the FCI and Federal Prison Camp, including hot-water boilers, cooling equipment, rooftop HVAC units, warehouse heating, kitchen make-up air systems and laundry energy- and water-recovery systems.

CLIENT
Siemens Government Technologies / Federal Bureau of Prisons

LOCATION
Ashland, Kentucky

PROJECT TYPE
Mechanical Construction

COMPLETED
2017

PROJECT VALUE
$3.3 million

MECHANICAL SCOPE

Comprehensive Mechanical & Energy System Upgrades

CIMCO’s scope combined HVAC replacement, heating-system improvements and energy-conservation measures across multiple areas of the federal correctional complex. The project was structured around improving building-system efficiency while adapting new equipment to existing institutional infrastructure.

Scope highlights:

  • Hot-water boiler replacement

  • Cooling-equipment consolidation

  • Rooftop HVAC unit replacement

  • Warehouse electric-heat conversion to infrared heating

  • Institution kitchen make-up air installation

  • Federal Prison Camp kitchen make-up air installation

  • Laundry washer/dryer electrical improvements

  • Laundry water-recycling upgrades

  • Laundry thermal-recovery upgrades

  • Coordination with existing mechanical and utility infrastructure

PROJECT EXECUTION

Coordinated Improvements Across an Active Federal Facility

CIMCO’s work at FCI Ashland involved multiple mechanical and energy-efficiency upgrades across the institution and Federal Prison Camp. The scope required coordination of new equipment with existing building systems, utilities and operational infrastructure throughout the correctional complex.

The project included boiler replacement, cooling-system consolidation, rooftop HVAC replacement, infrared heating, kitchen make-up air and significant laundry water- and thermal-recovery improvements. Siemens retained responsibility for the HVAC controls portion of the project.

Improving Energy Performance Across the Facility

ENERGY EFFICIENCY

The FCI Ashland project was developed as an Energy Savings Performance Contract, with improvements targeted at reducing energy consumption and improving the efficiency of existing building systems throughout the institution and Federal Prison Camp.

CIMCO’s work included laundry water-recycling and thermal-recovery improvements along with heating, cooling and ventilation upgrades designed to reduce operating demands while working within the constraints of existing federal facilities.

The laundry scope included water-recycling and thermal-recovery upgrades at both the institution and Federal Prison Camp, complementing the broader mechanical improvements across the complex.